This week the green staff will be carrying out the following work:
* Verti-draining the fairways.
* General cutting, not including wet areas.
* Verti-draining collars, approaches and tee tops.
* Shallow slitting, Sorrel rolling, rolling and cutting of the greens. All
these jobs on the greens are of minimal disturbance and are to help with air flow in
the top profile.
* Soiling and turfing the old winter tee mats that are no longer in use on the 3rd,
11th and 12th.
Thanks for your patience. The greens staff.